• 34ºc, Sunny

Parallel closes the deposit function on Parallel L2

Parallel Network, the full-chain L2 network, has announced that it will close the Parallel L2 recharge function. The deposit function on Parallel Bridge will be closed from July 9th. Users will not be able to cross-chain assets to Parallel L2 through this cross-chain bridge. The function of withdrawing assets from Parallel L2 remains open.