The first batch of SEAL01 chips is expected to be delivered in Q3 2024
BitDeer announces the technology roadmap for the SEALMINER bitcoin miner. SEAL01 chip energy efficiency 18.1J/TH, released in Q1 2024. The first batch is expected to be delivered in mass production in Q3 2024. SEAL02 chip is scheduled to be launched in Q3 2024, and the chip energy efficiency is expected to be 14J/TH. The second generation SEALMINER miner is expected to start mass production delivery in Q4 2024.
SEAL03 is scheduled to be launched in Q4 2024, with an expected chip energy efficiency of 10J/TH. The third-generation SEALMINER miner is expected to be delivered in mass production in Q2 2025. The SEAL04 chip is expected to be launched in Q2 2025, and the chip energy efficiency is expected to be as low as 5J/TH. The fourth-generation SEALMINER miner is planned for mass production, and deliveries are expected to begin in Q4 2025.